If the developer found winter frosts during the construction, then the construction can be suspended, but only at certain stages. A very suitable stage for freezing construction is the stage at which the case is already going on to the end. At this stage, walls and chimneys were built, an overlap was erected and a black staircase between the floors was installed and the most important thing has a roof with the planned coating. During the suspension of the construction of the tutus tower, you need to hide so that they do not deteriorate.
This stage is the most suitable for suspension, since it will not require large cash costs. Moreover, experts even recommend taking a break at this stage, since during the winter the walls will pass a little and dry, which will avoid cracking of plaster in the future. Closing plaster The most frequent phenomenon during the construction of the Stakhanov pace. To prepare a house for wintering, you should score windows and other openings with boards or plywood shields, but only on the outside. In this case, the snow will not fall into the room, melt and the walls will not get wet. For improved ventilation, the boards in the window openings should be arrived not closely, but with the abandonment of a small gap.