Piles are mainly used to strengthen the foundation in the construction of various structures. Pile piles today are already a familiar process in construction work, which explains a fairly high level of ownership of this technology.
To immerse already prepared piles, special installations are necessary – “cops” that are equipped with steam locomotive, mechanical, diesel hammer. It should be noted that the first two species have recently inferior to hydraulic and vibrational diesel young people with higher quality and performance, as well as the ease of use. Thanks to excellent maneuverability and cross -country ability, cooperative attitudes produced on a caterpillar are gained popularity.
Now we will try to determine the main aspects of the preparatory work before the direct pile pounding. These include the following:
1. Thorough cleaning and layout of the territory.
2. Distribution of the position of piles, work on the arrangement of cloaks of all the required directions and movements of Kopov.
3. Timely delivery and placement of piles; Delivery of special equipment.
4. Mandatory equipment of the operated territory, as well as all jobs.
5. A peculiar “rehearsal” to pile piles, helping to identify and correct certain nuances in the clogging scheme and production project.
Often, when driving, piles turn to special excavators equipped with a suspended mast. They can automatically score wooden, steel, sloping and reinforced concrete piles. In wooden piles, the lower end should be sharp (as a result, protective elements are installed on it). In order to avoid decay, such piles are treated with an effective antiseptic.