Very often, the owners of the houses in which they have been living for many years want to carry out a reconstruction. This is not surprising, because each building requires capital work that will improve housing conditions and extend the service life. In addition, the reconstruction of the house is needed by those people who plan replenishment in the family and want to increase the living area, complete another floor, make an extension, etc. D.
When you need reconstruction?
Of course, it is not easy to make a reconstruction, because for this you have to change the dimensions of the structure, carry out reorganization work, improve technical indicators, develop superstructures or extensions, and do much more. All this has to be done if it is necessary to expand the area of the premises (without resorting to the demolition of the building), change the purpose of the building (for example, turn non -residential premises into an office) or increase the production area.
Also, the reconstruction of the house is carried out before the residential building is completely worn out to extend its use. After all, it is not always possible to change the situation with a simple repair. For example, if errors made by the first stages of construction surfaced.
Now such services are very in demand, especially if you remember in what state the majority of the buildings are located. But only experienced specialists who have received permission to carry out such work from state bodies can engage in such activities. To do this, you need to prepare the documentation in advance on all the necessary work and coordinate them. It is impossible to do this without a qualified lawyer.
How to prepare for work?
Before reconstruction, it is necessary to carry out different measurements and checks. Firstly, you need to determine the composition of the soil in order to understand whether the soil will withstand the weight of the updated building. Secondly, you should find out in what condition are communication and t. D. Such a report must be drawn up and provided for coordination with state bodies. In addition, technological, architectural and construction estimates, a number of design documents and a general explanatory note will be required.
Only after that can you begin the direct reconstruction of the building. These works are responsible and important. If necessary, new communications are laid, measures are being taken to reduce economic damage. And the final stage is finishing work.
Thus, in order to rebuild the house, it will take a lot of time for a preliminary assessment of the state of the existing building, to coordinate in state bodies the changes that are planned to be made to direct repair and construction work. But, as a rule, the efforts spent are worth it and people can live in a convenient, safe and modern house.