Plassing the walls can be started before the onset of cold weather, since at low temperatures the plaster is poorly grasped and can give a precipitate. Also, you should not start finishing work in rainy autumn, since humidity often increases in this weather, the plastered walls will dry for a very long time. The metal safe of the doors in Yekaterinburg will be the key to the protection of your property.
Ideal for such work is considered the temperature in the room that does not drop below the mark of ten degrees Celsius. If plastering work is carried out in the summer, then there is no need to install windows and window sills, especially since plaster work is considered “dirty” and in the process of passing new windows and doors can be strongly stained and scratched. If the developer planned to carry out plastering work in the fall or winter, then he must install windows in advance or, in extreme cases, score window and doorways with plywood or plastic sheets. It is very convenient if the heating system was carried out and tested before the scurrying, then for the fastest drying of the walls you can use connected radiators. Before starting plaster work, all radiators or batteries must be dismantled.