The shower cabin consists of three separate parts: the side panel that goes along the entire length of the cab and two end panels. When installing a new shower, drain holes must be done again, since each cab has its own pipes eyeliner. The best way to make sure that the drain holes in the shower are properly cut out is a check of water drainage. Cutting process consists of several stages.
Install the side panel and back (frame) of the shower cabin without mounting the pallet. Measure the distance from the ends of the side panel to the place where the drain is planned. Make notes for the future hole. Repeat the measurement process again to make sure that errors are excluded. It will not be superfluous at leisure to study the main features of the landscape style on the Internet.
Make a hole using a drill and a construction hammer. Then insert the pipe into this hole, insulating the hole with a special material, which are formed due to the mismatch of the diameter of the drain and pipe. The final stage is the drilling of the hole for the crane handle if it is absent. Set the pallet, carefully ensuring that the drain hole in the material coincides with a cut drain in shape. After that, pipes with water are brought up and you can use the shower cabin to the fullest.