I would like to cover such a very interesting topic in our opinion in the field of individual housing construction as the need to carry out a detailed project of your house. Currently, the procedure for obtaining a building permit was greatly simplified, this cannot but rejoice!
And if 10 years ago, in order to get permission and put the built house into operation, you needed to show the approved house project, now, at best, you will be asked only a sketch, indicating the layouts, facades, sections on which should be set Height marks and overall dimensions. Perhaps, after the end of the construction, it will be necessary to present a photo of the house.
In the future, BTI will work on this document.
Looking ahead, I will say, I did the project of the house on my own (the architectural part) and did not take into account much and then ran into some difficulties. While I decided them, I was engaged in the manufacture of a layout of a house from plasticine.
If there are detailed projects of the house tied to specific conditions (site), it was possible to significantly reduce the cost of the construction and save precious time.
It would be nice to carry out a project of gasification of a private house in advance. In the future, when connecting to the main gas pipeline, this project can help you a lot.
And since in most cases construction work is carried out by unskilled workers who came here to work, it is not necessary to say that they will not have to see what is drawn in the project. The foreman, as a rule, indicates them how and what to do based on their own experience. On the one hand, this, of course, can greatly reduce the cost of construction. But such an opinion is actually deceptive.
Let’s look at why you need to carry out a full project of the house before the start of construction:
The architectural part does not provide for the choice of building materials. With the same wall thickness, the constructive and weight, as well as the thermal conductivity of the walls, can differ greatly, which can lead to a revenge of funds on an excessive powerful foundation, or you will have to spend on additional insulation.
On the planned design (type of heating), the “pie” of the floor and the wall of the walls may depend. In most cases, heating pipes can even be shaken into the ceiling and walls at the stage of erecting the house.
The power grid project also needs to be done in advance. But after fulfilling the full sketch of the interiors of your future home. In order not to smash and not to disassemble the newly built if necessary to add a new outlet. For the cost of dismantling equipment and further assembly will naturally entail additional expenses.
Thus, ideally, before starting the construction of your own home, you must draw up a clear plan-schedule for the performance of work on a pre-completed project. And only in this case you can reduce your unplanned expenses to a minimum.
It is necessary to include sections: the architectural part, the construction part, the project of earthwork, ventilation and air conditioning, heating, etc. If you have corresponding skills and abilities and you can make a project at home yourself.